Every animation on this site plays a trace recorded by a scenario under
tools/trace/scenarios/, from the block’s own C++. Together the scenarios
are the blocks’ scenario suite (BB-I2 of the
building block standard). This page lists
all of them.
Each scenario links to two kinds of page:
- Shown on goes to the players that explain the scenario, with panels chosen for that purpose;
- the scenario’s name goes to its own page, which plots every channel that changes and lists the rest.
How the scenarios are run
Section titled “How the scenarios are run”- On every pull request, CI runs every scenario with gcc and clang and compares each trace with the committed one (what CI checks). A trace that differs, or a scenario that fails, fails the pull request.
- On every deploy, and nightly, the docs workflow runs the suite again on main with both compilers, compares the traces with the committed ones, and publishes the site from the gcc run. A failing scenario is published, so that it shows here, and the workflow then fails.
Status
Section titled “Status”| Status | Meaning |
|---|---|
| ✓ pass | Every check passes |
| ✗ fails, as designed | A check fails that the trace marks "expect": "fail": the scenario shows the edge of the block’s envelope, and the page that plays it explains why. Every other check passes |
| ✗ fail | A check fails |
| ! passes, but is meant to fail | A check marked "expect": "fail" passes: the scenario no longer shows what its page says it does |
| – no checks | The scenario illustrates without a pass criterion; its page’s prose states what to look for |
| ✗ compiler: … | That compiler’s run of the scenario did not run, wrote an invalid trace, or differs from the committed trace |
Fail, passes, but is meant to fail, and a compiler’s failure count as failing.
29 scenarios, none failing. Their checks: 23 pass, 1 fail as designed, 0 fail, 5 have none.
Run on 2026-11-12 11:29 UTC at commit 2183adc, with clang (clang 18.1 optimized) and gcc (gcc 13.3 optimized). Each run is compared with the committed traces; the pages play the gcc run, or the committed trace where that run wrote none or an invalid one. Workflow run.
Quadrotor model
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
battery_ | How much headroom does a draining battery leave? Quadrotor Model Deployment | — | – no checks |
dt_ | How fast does the error shrink as the step size halves? Quadrotor V&V Plan | BB-V2 position_ 3.97 ≥ 3.7 | ✓ pass |
ground_ | What does the model do at take-off and touch-down? Quadrotor V&V Plan | BB-T4 grounded_ 0 ≤ 0 | ✓ pass |
invariant_ | Where does an invalid state come from? Quadrotor Model | — | – no checks |
mirror | Does the reflected flight mirror the original? Quadrotor V&V Plan | BB-V4 mirror_ 1.18e-15 ≤ 1.14e-13 | ✓ pass |
motor_ | How quickly does a rotor follow its command? How the Quadrotor Model Works | BB-V1 rotor_ 3.32e-6 ≤ 1.00e-4 rad/s | ✓ pass |
punch_ | What happens to a roll command at full throttle? Quadrotor Model Deployment | — | – no checks |
roll_ | What does a roll torque pulse do to an uncontrolled quadrotor? How the Quadrotor Model WorksWhat does a roll torque pulse do to an uncontrolled quadrotor? Trace Player | BB-V3 attitude_ 4.44e-16 ≤ 1.78e-15 | ✓ pass |
rotor_ | Which way does each rotor push and twist the body? How the Quadrotor Model Works | — | – no checks |
tumble | Why does a spin about the middle axis flip over? How the Quadrotor Model Works | BB-V3 energy_ 2.18e-11 ≤ 1.00e-6 | ✓ pass |
PID controller
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
derivative_ | How much should the derivative be filtered? How the PID Controller Works | — | – no checks |
external_ | What happens when a downstream cut is not reported? PID Deployment | BB-V1 reported_ 2.44e-4 ≤ 0.001 | ✓ pass |
integral_ | How large a disturbance can the integral cancel? PID Deployment | BB-V1 height_ 4.04e-9 ≤ 0.001 m | ✓ pass |
terms | What does a proportional controller alone do to a height? How the PID Controller WorksWhat does damping add, and what does it leave? How the PID Controller WorksHow does the integral remove the offset? How the PID Controller WorksDoes the PD loop settle at the closed-form offset? PID V&V Plan | BB-V1 pd_ 1.22e-14 ≤ 0.001 m BB-T1 pid_ 2.22e-4 ≤ 0.001 m | ✓ pass |
timing_ | What does the controller do when its scheduler misbehaves? PID Controller | BB-T1 output_ 0 ≤ 0 | ✓ pass |
windup | Why does a saturated integral make the loop slow to recover? How the PID Controller WorksDoes the loop recover at once when the setpoint comes back within reach? PID V&V Plan | BB-T1 recovery_ 0.088 ≤ 0.2 s | ✓ pass |
Mixer
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
clip_ | At full throttle, what does plain per-rotor clipping cost? How the Mixer WorksDoes the tilt settle when every rotor is saturated? Mixer V&V Plan | BB-I2 tilt_ 0.02456 ≤ 0.05236 rad | ✓ pass |
priority | How much roll can RP-1 get, and at what collective? Mixer DeploymentAs the roll demand grows past what the rotors can give, what goes first? How the Mixer WorksIs the achieved torque always the demand, scaled? Mixer V&V Plan | BB-T1 achieved_ 4.44e-16 ≤ 1.00e-12 N·m | ✓ pass |
throttle_ | Across the whole throttle range, when does the mixer change the demand? How the Mixer WorksDoes any rotor jump where the mixer starts or stops cutting? Mixer V&V PlanWhich channel does the report flag as the throttle sweeps? Mixer | BB-T1 rotor_ 0.5 ≤ 1 | ✓ pass |
Cascaded controller
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
climb | When the thrust runs out on a climb, does the controller wind up? How the Cascade WorksAfter 2 s against the thrust limit, does the climb overshoot? Cascade V&V Plan | BB-I2 overshoot_ -0.03701 ≤ 0.05 | ✓ pass |
roll_ | How do the loop gains shape a roll step? How the Cascade Works | BB-I2 roll_ 0 ≤ 0.1 | ✓ pass |
schedule | How often does each loop update its output? How the Cascade WorksDoes each loop update only on its own ticks? Cascade V&V Plan | BB-T1 updates_ 0 ≤ 0 | ✓ pass |
tilt_ | Does a large turn slow the tilt down? How the Cascade WorksDoes a 90° turn slow the tilt down? Cascade V&V PlanDoes a 90° turn change how the vehicle tilts? Cascaded Controller | BB-I2 tilt_ 0.002 ≤ 0.004 s | ✓ pass |
waypoint | What does the cascade fly from a setpoint with feed-forward? Cascade DeploymentHow closely does the cascade follow a moving setpoint? How the Cascade Works | BB-I2 worst_ 0.1981 ≤ 1 | ✓ pass |
Gyro filters
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
delay | How long do the gyro filters delay a change in roll rate? How the Gyro Filters WorkDoes the gyro chain leave the rate loop 45° of phase margin? Gyro Filters V&V Plan | BB-C2 rate_ 53.04 ≥ 45 deg | ✓ pass |
low_ | What can the notches do at a 1 kHz gyro rate? Gyro Filters Deployment | BB-I2 vibration_ -1.079 ≤ -30 dB BB-C2 motion_ 3.40e-4 ≤ 0.02 | ✗ fails, as designed |
notch | What does one notch do to a tone that sweeps through it? How the Gyro Filters WorkIs the notch as wide as its closed form says? Gyro Filters V&V Plan | BB-V1 width_ 0.472 ≤ 3.75 Hz | ✓ pass |
sweep | Do the notches keep up with a throttle sweep? How the Gyro Filters WorkDo the tracked notches leave less than −30 dB of the vibration? Gyro Filters V&V Plan | BB-I2 vibration_ -70.68 ≤ -30 dB BB-C2 motion_ 2.55e-4 ≤ 0.02 | ✓ pass |
player
| Scenario | Shown on | Checks | Status |
|---|---|---|---|
scene_ | What does a trace's scene show around the vehicle? Trace Player | BB-I2 worst_ 0.1981 ≤ 1 | ✓ pass |